2. Owners can assign project performance liability to the design-builder
Project risks are associated with design, project performance, building and administrative permits, coordination with existing facilities, fines and penalties, proprietary processes or equipment, schedule, cost, quality of existing infrastructure, construction warranty and professional liability. Because the CMAR process makes use of two contracts, the ability to transfer risk is more limited than PDB and liability, in most cases, remains with the owner. For example, under a CMAR construction contract, the contractor has no responsibility for developing the design documents. The owner remains liable for any issues and considerations outside a requirement for the contractor to conform with the “as-bid” documents.
Since PDB makes use of one contract, the design-builder becomes the single point of accountability, committed to delivering a project that performs within a set of parameters defined by the contract. These project performance requirements are much more encompassing and serve to transfer risk away from the owner.
3. Progressive design-build enables more effective risk management
The goal of PDB contracts is to have risk, contingency, and pricing discussed during Phase 1 – and to have an understanding between the owner and the design-builder on the consequences of breaking the agreement. Owners recognize value when using the PDB process to:
Allow the team to better identify, control, and possibly transfer project risk
Facilitate active discussion of risk and the development of solutions on how best to address it
Permit the project team to assign responsibility to the party best able to address the risk (owner or design-builder)
Provide open-book transparency on how risk is being accounted for in the project price
Owners should consider collaborative project delivery methods when evaluating options to design and construct water infrastructure projects. While both CMAR and PDB offer opportunities to improve project execution, PDB presents opportunities to better manage risk.