U.S. Army Cyber Command HQ with State-of-the-Art Facilities

Us American Army Flags

Share this page:

Project Name
U.S. Army Cyber Command (ARCYBER) Headquarters Facilities
Location
Ft. Gordon, GA
Client
USACE Savannah District

Black & Veatch has developed the full design documents for the U.S. Army Cyber Command (ARCYBER) headquarters facilities. Black & Veatch is currently assisting in the bidding process and will continue to support the project during construction. This unique facility, linking the new headquarters to the existing Whitelaw Facility includes:

  • 324,000 square feet of command and control space

  • 10,000 square feet of data center space

  • 2,500 square foot server room

  • 2 Independent Phases of Construction

  • An Operations Floor that seats over 250

  • Open collaborative work space

  • Mission support spaces

  • War rooms

  • Executive Suite overlooking the Operations Floor

  • Ceremonial Briefing Room

  • Three-star Command Suite

  • Shared Resources scattered throughout the facility

  • Forensics and malware laboratories

  • Fitness center

  • Zones for teaming session with variously sized conference rooms

  • Non-Secure Cafeteria for guests and special events

  • Secure Courtyard

  • Security design including AT/FP Standards and Secure Access Entry Gate

  • Site Features for Vehicle Circulation, Parking, Drop-off, and Pedestrian Access

Black & Veatch has worked with the ARCYBER command group to tailor the needs of the facility to meet their current operational requirements while maintaining the flexibility necessary as their mission evolves. This includes the operations floor which considers individual team space requirements as well as the capability to facilitate collaboration between teams to meet mission. The design includes an interface between the new headquarters and the existing Whitelaw Facility to increase collaboration as well. This will be achieved through connecting the new and existing Operations Floors as well as linking the communication systems of the two buildings. Additionally, the new and existing Demarcation Rooms will be connected.